LAHomework Sign in
Hacienda Heights, CA 91745 · Turnbull Canyon Rd

2021 Turnbull Canyon Rd

Built 1994 · 7,716 sq ft
LOT 44,055 SQ FT · 1 STRUCTURE · APN 8221-011-031Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1994
Living area
7,716 sqft
Lot size
1.01 acres
Structures on lot
1
Bedrooms
5
Bathrooms
7
Home type
Single-family
Parcel (APN)
8221-011-031

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2024From build year 1994
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 157 homes on Turnbull Canyon Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on file, unconfirmedElectrical: Electrical Isolation Of (2) Breakers Due To Fire Damage
  • 2023
    permit on file, unconfirmedKitchen: Insulation And Drywall Insulation Is Being Installed On The 1St Floor Kitchen And Dining Area, 2Nd Floor Master Bedroom, Closet And Bathroom. 850 Sf Same Locations, Installed On The 1St Floor Kitchen And Dining Area, 2Nd Floor Master Bedroom, Closet And Bathroom. Replace 16 Outlets And 10 Light Fixt
  • 2023
    permit on file, unconfirmedElectrical: Elec For Bldr230525004898 Insulation And Drywall Insulation Is Being Installed On The 1St Floor Kitchen And Dining Area, 2Nd Floor Master Bedroom, Closet And Bathroom. 850 Sf Same Locations, Installed On The 1St Floor Kitchen And Dining Area, 2Nd Floor Master Bedroom, Closet And Bathroom. Replace 16
  • 2023
    permit on file, unconfirmedHeating & cooling: Mech For Bldr230525004898 : Insulation And Drywall Insulation Is Being Installed On The 1St Floor Kitchen And Dining Area, 2Nd Floor Master Bedroom, Closet And Bathroom. 850 Sf Same Locations, Installed On The 1St Floor Kitchen And Dining Area, 2Nd Floor Master Bedroom, Closet And Bathroom. Replace
  • 2023
    permit on file, unconfirmedPlumbing: Plmb For Bldr230525004898 : Insulation And Drywall Insulation Is Being Installed On The 1St Floor Kitchen And Dining Area, 2Nd Floor Master Bedroom, Closet And Bathroom. 850 Sf Same Locations, Installed On The 1St Floor Kitchen And Dining Area, 2Nd Floor Master Bedroom, Closet And Bathroom. Replace
  • 2023
    permit on fileBathrooms: Fire Damage Repair On 2Nd Floor At Northeasterly Side Of (E) Sfd: Replace Ceiling Joists, Replace Interior Nonbearing Wall And Remodel Master Bathroom.
  • 2023
    permit on fileElectrical: Elec For Unc-Bldr230922009102: Fire Damage Repair On 2Nd Floor At Northeasterly Side Of (E) Sfd: Replace Ceiling Joists, Replace Interior Nonbearing Wall And Remodel Master Bathroom. Contractor/Owner To Verify Accuracy Of Line Items Prior To Final Inspection, Additional Fees May Apply
  • 2023
    permit on filePlumbing: Plmb For Unc-Bldr230922009102: Fire Damage Repair On 2Nd Floor At Northeasterly Side Of (E) Sfd: Replace Ceiling Joists, Replace Interior Nonbearing Wall And Remodel Master Bathroom. Contractor/Owner To Verify Accuracy Of Line Items Prior To Final Inspection, Additional Fees May Apply
  • 2023
    permit on fileHeating & cooling: Mech For Unc-Bldr230922009102: Fire Damage Repair On 2Nd Floor At Northeasterly Side Of (E) Sfd: Replace Ceiling Joists, Replace Interior Nonbearing Wall And Remodel Master Bathroom. Contractor/Owner To Verify Accuracy Of Line Items Prior To Final Inspection, Additional Fees May Apply

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2024