LAHomework Sign in
Alhambra, CA 91801 · S Sierra Vista Ave

2012 S Sierra Vista Ave

Built 1925 · 1,056 sq ft
LOT 8,120 SQ FT · 1 STRUCTURE · APN 5255-022-030Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1925
Living area
1,056 sqft
Lot size
8,120 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
5255-022-030

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 213 homes on S Sierra Vista Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileSolar: Installing 3.28 Kw Residential Roof Mounted Pv System
  • 2024
    permit on fileRoom addition: New Two Story 1170 S.F. Adu (3Bd, 4B, Kitchen And Living Room)
  • 2024
    permit on fileRoom addition: Convert 411 Existing Garage Into Jadu. (1B1B, Kitchen And Living Room)
  • 2024
    permit on fileHeating & cooling: Mechanical Permit Required To Install Certain Application In Adu Such As Air Conditioner And Air Ventilation Systems. Building Plan: Badu-2022-0033
  • 2024
    permit on file, unconfirmedPlumbing: Plumbing Permit Required For Adu Construction. Building Plan: Badu-2022-0033
  • 2024
    permit on filePlumbing: Plumbing Permit Required For Jadu. Building Plan: Badu-2022-0034
  • 2024
    permit on fileHeating & cooling: Mechanical Permit Required To Install Appliances In Jadu Unit, Air Conditioners, Ventilation Systems Etc. Building Plan: Badu-2022-0034
  • 2024
    permit on fileElectrical: Electricity Needed For The Jadu Unit. Project Plan: Badu-2022-0034
  • 2024
    permit on fileElectrical: Electrical Permit Needed For An Adu. Scope Of Work: 2 Story 1170 Sf Adu And Convert 411 Sf Existing Garage Into Jadu Building Plan: Badu-2022-0033

Manage this home to schedule a service or to update the timeline.