LAHomework Sign in
Los Angeles, CA 90039 · N Alvarado St

2002 N Alvarado St

Built 1961 · 1,907 sq ft
LOT 7,455 SQ FT · 1 STRUCTURE · APN 5420-005-019Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1961
Living area
1,907 sqft
Lot size
7,455 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Duplex (2 units)
Parcel (APN)
5420-005-019

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2020
Expected 2040 to 2050From the 2020 permit
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 62 homes on N Alvarado St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileKitchen: Interior Kitchen Remodel/Repair (No Changes In Walls Or Openings). 1 Bathroom(S).Bathroom Remodel For Residential Buildings (No Structural Changes)..
  • 2023
    permit on fileElectrical: Replace Sub Panel
  • 2023
    permit on fileElectrical: Replace Sub Panel
  • 2023
    permit on filePlumbing: Pex Repipe, Remove/Replace Fixtures
  • 2023
    permit on filePlumbing: Replace Sub Panel, Pex Repipe
  • 2023
    permit on fileHeating & cooling: Installation Of A Mini-Split Hvac System
  • 2020
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing __15____Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labe

Manage this home to schedule a service or to update the timeline.