LAHomework Sign in
Rowland Hts, CA 91748 · Carolyn Pl

19971 Carolyn Pl

Built 1989 · 2,027 sq ft
LOT 24,148 SQ FT · 1 STRUCTURE · APN 8269-056-008Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1989
Living area
2,027 sqft
Lot size
24,148 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
8269-056-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2018
Expected 2033 to 2038From the 2018 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 17 homes on Carolyn Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on file, unconfirmedSolar: Roof Mounted Solar 10.150Kw Dc/ 9.906Kw Ac Consisting Of 29 Modules And 29 Microinverters.
  • 2022
    permit on fileSolar: Installation Of Roof-Mounted Pv System - 9.48 Kw (29 Modules) With (N)100A Load Center
  • 2022
    permit on fileElectrical: (N)100A Load Center Ref: Unc-Solr220505002324 *** Warning! Conductors Shall Not Exit The Back Of Any Surface Mounted Electrical Equipment; *** For Exterior Semi-Flush Mounted Electrical Equipment: Lath/Plaster Shall Not Be Installed Prior To Initial Inspection; *** For Exterior Surface Mounted Elect
  • 2018
    permit on fileRoom addition: Remodel Of Hallway Bath (160 Sf) And Master Bath (115 Sf) Of 2Nd Floor Removal And Addition Of Non Bearing Walls To Hallway To Be Verified By Inspector.
  • 2018
    permit on filePlumbing: Remodel Of Hallway Bath (160 Sf) And Master Bath (115 Sf) Of 2Nd Floor Removal And Addition Of Non Bearing Walls To Hallway To Be Verified By Inspector.
  • 2018
    permit on fileElectrical: Remodel Of Hallway Bath (160 Sf) And Master Bath (115 Sf) Of 2Nd Floor Removal And Addition Of Non Bearing Walls To Hallway To Be Verified By Inspector.
  • 2018
    permit on fileHeating & cooling: Remodel Of Hallway Bath (160 Sf) And Master Bath (115 Sf) Of 2Nd Floor Removal And Addition Of Non Bearing Walls To Hallway To Be Verified By Inspector.

Manage this home to schedule a service or to update the timeline.