LAHomework Sign in
Walnut, CA 91789 · Newbridge Cir

19801 Newbridge Cir

Built 1970 · 1,954 sq ft
LOT 8,196 SQ FT · 2 STRUCTURES · APN 8762-021-020Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1970
Living area
1,954 sqft
Lot size
8,196 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
8762-021-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2022
Expected 2042 to 2052From the 2022 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 6 homes on Newbridge Cir →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileSolar: Pv(22) Modules At 440 Watts 9.680 Kw-Dc / 8.803 Kw-Ac (22) Optimizers Roof Mounted (1) Solaredge Inverter(1)Solaredge Back Up 125 Amps (1)Solaredge Energy Bank 9.7Kwh Battery No Panel Upgrade
  • 2022
    permit on fileElectrical: Electrical Service Upgrade To 200 Amps ***Warning! Conductors Shall Not Exit The Back Of Any Surface Mounted Electrical Equipment; *** For Exterior Semi-Flush Mounted Electrical Equipment: Lath/Plaster Shall Not Be Installed Prior To Initial Inspection; *** For Exterior Surface Mounted Electrical Eq
  • 2022
    permit on fileRoof: Reroof Sfr W/ Attached Garage (26 Sqs, Pitch 6/12): T/O (E) Tile Roof, C/O Plywood Sheathing As Needed, Install (2) Layers Of Synthetic Underlayment, Install Owens Corning Oakridge Class A Shingles (Crrc: 0890-0036, Calculated Aged Sri: 21, Color: Cliffside Gray)
  • 2022
    permit on file, unconfirmedSolar: Pv (22) Modules At 440 Watts 9.680 Kw-Dc / 10.404 Kw-Ac (22) Optimizers Roof Mounted Energy Bank 9.7 Kwh Ref Unc-Elec221114009675
  • 2022
    permit on file, unconfirmedElectrical: 200 Amps Main Service Panel Upgrade (Ref: Solr221114006602) *** Warning! Conductors Shall Not Exit The Back Of Any Surface Mounted Electrical Equipment; *** For Exterior Semi-Flush Mounted Electrical Equipment: Lath/Plaster Shall Not Be Installed Prior To Initial Inspection; *** For Exterior Surface

Manage this home to schedule a service or to update the timeline.