LAHomework Sign in
Pasadena, CA 91107 · Canyon Close Rd

1955 Canyon Close Rd

Built 1955 · 2,215 sq ft
LOT 9,856 SQ FT · 1 STRUCTURE · APN 5857-018-023Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1955
Living area
2,215 sqft
Lot size
9,856 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5857-018-023

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2018
Expected 2038 to 2048From the 2018 permit
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterOn record 2009
Usually done by 2024From the 2009 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 38 homes on Canyon Close Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedPool: Pool Replaster, Install New Waterline Tile, Install New Pvc Niche With New Electrical Conduit And Junction Box, And Split Pool Main Drain 36" Apart To Bring Up To Code. No Structural Work Or Modifications Will Be Done To Existing Structure Of Pool.
  • 2026
    permit on file, unconfirmedBathrooms: Express Permit. Express Remodel Permit - Like For Like. Sfr. No Structural. No Layout Changes. No Additional Square Footage. No Exterior Work. No Change To Windows/Doors. 1 Bathroom(S).
  • 2025
    permit on fileHeating & cooling: Express Permit. Reduct With R8 Rated Ducts, Enlarge 2 Returns
  • 2019
    permit on fileKitchen: Kitchen Remodel
  • 2019
    permit on fileElectrical: Electrical For Kitchen Remodel
  • 2019
    permit on filePlumbing: Plumbing For Kitchen Remodel
  • 2019
    permit on fileHeating & cooling: Replace Kitchen Hood For Kitchen Remodel
  • 2018
    permit on fileRoof: Remove Old Comp Roof; Reroof Using Class "A" Lifetime Comp Shingles (Mountain Timber) @ 36Sq
  • 2009
    permit on fileWater heater: Water Heater Change Out
  • 2004
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2004
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2000
    permit on fileWater heater: Water Heater Change Out
  • 1996
    permit on fileHeating & cooling: Replace Forced Air Furnace + Add A/C Unit
  • 1994
    permit on fileWater heater: Re-Pipe Water Service Change Out Water Heater

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2024