LAHomework Sign in
Los Angeles, CA 91356 · Shenango Dr

19460 Shenango Dr

Built 1967 · 2,913 sq ft
LOT 19,361 SQ FT · 1 STRUCTURE · APN 2180-008-001Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1967
Living area
2,913 sqft
Lot size
19,361 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
2180-008-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterOn record 2021
Expected 2031 to 2036From the 2021 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 11 homes on Shenango Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on fileGeneral remodel: Window Change-Out (13) (Same Size & Type) For Residential Buildings. Dual Glazing, Labeled And Certified By National Fenestration Rating Council (Nfrc), Is Required For Doors And Windows Replaced In All Residential Buildings, Three Stories Or Less, Per Section 152(B) Of Title 24. Re-Stucco (No New W
  • 2021
    permit on fileElectrical: Replacing Existing Recessed Lighting."Comply With Department Order Effective Date08/16/2021. Permit Will Expire 30 Days From Issuance Date".
  • 2021
    permit on fileWater heater: Bathroom Remodeltankless Water Heater
  • 2021
    permit on fileHeating & cooling: Installing New Hvac
  • 2020
    permit on fileKitchen: Relocate Kitchen And Remove And Replace Fixtures On First Floor For Single Family Dwelling.
  • 2016
    permit on file, unconfirmedPlumbing: Plumbing Permit · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2031
    Water heater replacementExpected 2031 to 2036