LAHomework Sign in
Pasadena, CA 91103 · El Sereno Ave

1926 El Sereno Ave

Built 1922 · 2,745 sq ft
LOT 11,135 SQ FT · 2 STRUCTURES · APN 5836-020-020Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1922
Living area
2,745 sqft
Lot size
11,135 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
3
Home type
Duplex (2 units)
Parcel (APN)
5836-020-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2010
Expected 2030 to 2040From the 2010 permit
20262035
HVACOn record 2014
Expected 2029 to 2034From the 2014 permit
20262035
Water heaterOn record 2010
Usually done by 2025From the 2010 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 139 homes on El Sereno Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2014
    permit on filePlumbing: Legalization For Washing Machine And Dryer In Laundry
  • 2014
    permit on fileElectrical: Electrical Off Over A Year
  • 2014
    permit on fileHeating & cooling: Adding Fau & Mechanical Fixtures For Addition/Remodel
  • 2013
    permit on fileElectrical: Install Electrical For Addition
  • 2013
    permit on filePlumbing: Install Plumbing For Addition
  • 2013
    permit on fileRoom addition: Addition To Rear House At 347 Square Feet And Remodel House At 900 Square Feet. Construct New Detached Garage At 400 Square Feet.
  • 2010
    permit on fileKitchen: Residential Kitchen / Bath Remodel
  • 2010
    permit on fileElectrical: Install Electrical Fixtures & Dishwasher For Interior Remodel
  • 2010
    permit on fileHeating & cooling: Install Vent Fan For Bath Remodel
  • 2010
    permit on filePlumbing: Residential (Partia) Copper Repipe Add Lawn Sprinklers Drainage Vent Piping & Change Out Plumbing Fixtures @ Same Location
  • 2010
    permit on fileWater heater: Leagalize Water Heater Replacement (Located In Basement)
  • 2010
    permit on fileRoof: Tear Off Existing Roof On House And Detached Garage. Resheet With 12/32" Techshield Or Radiant Barrier Re-Roof With 30 Yr Shing Roof Class 'A' No Change On Materials.
  • 2010
    permit on fileElectrical: Install 6 Grounded Outlets
  • 2010
    permit on filePlumbing: Replace Water Main W/Copper Pipes
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2006
    permit on fileGeneral remodel: After The Fact Permit To Add 60 Sq/F (House Addition) And 400 Sq/F Carport
  • 2005
    permit on fileElectrical: Electrical Fixtures For Rewiring
  • 2005
    permit on fileGeneral remodel: Stucco Over Siding & Windows Replacement - Same Size And Location
  • 2005
    permit on fileGeneral remodel: Drywall And Insulation
  • 1996
    permit on fileGeneral remodel: New Const. 2 Car Garage
  • 1990
    permit on fileElectrical: El - Up-Grede Electrical Servs. To 100 Amps
  • 1990
    permit on fileElectrical: El - Up-Grade Electrical Servs. 70 Amps

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2025
  • 2029
    HVAC replacementExpected 2029 to 2034
  • 2030
    Roof replacementExpected 2030 to 2040