LAHomework Sign in
Los Angeles, CA 90035 · Roxbury Dr

1918 Roxbury Dr

Built 2004 · 5,078 sq ft
LOT 10,846 SQ FT · 1 STRUCTURE · APN 4307-014-026Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2004
Living area
5,078 sqft
Lot size
10,846 sqft
Structures on lot
1
Bedrooms
6
Bathrooms
7
Home type
Single-family
Parcel (APN)
4307-014-026

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2024 to 2034From build year 2004
20262035
HVACWorth a look now
Usually done by 2024From build year 2004
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 173 homes on Roxbury Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoom addition: Trellis Addition To (E) Sfd.
  • 2020
    permit on fileSolar: [Eplan] Pc For New Pv1 Installation. System Size Is 20.3 Kwdc (18.27 Kwac) Using (58) Spr-X21-350-Blk-E-Ac Modules. Main Breaker Derate Shall Be Under Separate Permit.
  • 2020
    permit on fileElectrical: Derate Main Breaker From 200A To 175A
  • 2019
    permit on file, unconfirmedSolar: Pv1. Install 20.3 Kw Roof Mounted Grid Tied Pv System. (58) Ac Modul · GREEN CONVERGENCE
  • 2013
    permit on fileElectrical: Electrical Permit · SOLARCITY CORPORATION

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2024
  • Now
    Roof replacementExpected 2024 to 2034