LAHomework Sign in
Rowland Heights, CA 91748 · Galatina St

19165 Galatina St

Built 1966 · 2,809 sq ft
LOT 6,474 SQ FT · 1 STRUCTURE · APN 8272-020-008Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1966
Living area
2,809 sqft
Lot size
6,474 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
6
Home type
Single-family
Parcel (APN)
8272-020-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2018
Expected 2033 to 2038From the 2018 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 98 homes on Galatina St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on file, unconfirmedSolar: Installation Of (16) Roof Mounted Solar Panels With (16) Micro Inverters = 6.4 Kw With No Upgrade.
  • 2020
    permit on fileElectrical: New Electrical Panel For Fire Damaged Sfd - Bldr180927004577 ***Attention: Conductors Do Not Leave The Back Of Surface Mounted Panels Note: Mase Construction Is The New Name Of Klug Construction (Same Owner)
  • 2019
    permit on fileGeneral remodel: Approved Only For Changes On S-4. New Shingles On Attached Garage And Structual Support 400 Sqft
  • 2018
    permit on fileRoom addition: Repair Fire Damaged 2 Story Sfr (2547 Sf) New 2Nd Story Addition To (E) Sfr 300 Sf New Master Bed, Bath & Closet
  • 2018
    permit on fileHeating & cooling: Repair Fire Damaged 2 Story Sfr (2547 Sf) New 2Nd Story Addition To (E) Sfr 300 Sf New Master Bed, Bath & Closet
  • 2018
    permit on fileElectrical: Repair Fire Damaged 2 Story Sfr (2547 Sf) New 2Nd Story Addition To (E) Sfr 300 Sf New Master Bed, Bath & Closet
  • 2018
    permit on filePlumbing: Repair Fire Damaged 2 Story Sfr (2547 Sf) New 2Nd Story Addition To (E) Sfr 300 Sf New Master Bed, Bath & Closet

Manage this home to schedule a service or to update the timeline.