LAHomework Sign in
Los Angeles, CA 91324 · Ballinger St

19124 Ballinger St

Built 1960 · 2,519 sq ft
LOT 13,965 SQ FT · 1 STRUCTURE · APN 2762-010-006Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1960
Living area
2,519 sqft
Lot size
13,965 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2762-010-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 62 homes on Ballinger St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileSolar: [Eplan] Pv1 Plan Check For New Roof Mounted Pv System. Pv System Size Is 3.16 Kw Dc/2.923 Kw Ac. Scope Of Work Consists Of (8) Pv Modules With Optimizers And A Inverterexisting Pv System Present
  • 2020
    permit on fileSolar: Installation Of Roof-Mounted Solar Pv System, Not Exceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling
  • 2017
    permit on file, unconfirmedElectrical: Electrical Permit · POWER SPOT ELECTRIC INC

Manage this home to schedule a service or to update the timeline.