LAHomework Sign in
Rowland Heights, CA 91748 · Amberly Pl

18953 Amberly Pl

Built 1997 · 4,059 sq ft
LOT 7,290 SQ FT · 1 STRUCTURE · APN 8269-086-090Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1997
Living area
4,059 sqft
Lot size
7,290 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
8269-086-090

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2017 to 2027From build year 1997
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 43 homes on Amberly Pl →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on file, unconfirmedWater heater: Replace 75 Gallon Gas Water Heater And Recirculation Pump
  • 2022
    permit on fileBathrooms: Non Structural Bathroom Remodels (3) Total And (1) Powder Room - Subject To Field Verification: Master Bathroom - Drop In Tub To Free Standing Tub And New Shower (Combo) Upstairs Hallway Bathroom - Tub To Shower Upstairs Guest Room- Tub To Shower Powder Room - Vanity And Lavaratory All Areas Include
  • 2022
    permit on filePlumbing: Plumbing For Non Structural Bathroom Remodels (3) Total And (1) Powder Room - Subject To Field Verification: Master Bathroom - Drop In Tub To Free Standing Tub And New Shower (Combo) Upstairs Hallway Bathroom - Tub To Shower Upstairs Guest Room- Tub To Shower Powder Room - Vanity And Lavaratory All
  • 2022
    permit on filePlumbing: Permit To Replace Kitchen Sink, Dishwasher, Garbage Disposal, And Kitchen Faucet (Subject To Field Verification)
  • 2022
    permit on fileElectrical: Electrical Permit For Non Structural Bathroom Remodels (Reference Bldr220808007167) Includes (5) Lighting Fixtures (Led Mirror) In Bathrooms Only ; Includes (1) Bathroom Outlet Relocation In Master Bathroom To Accomidate Cabinet Work, And (1) Outlet Relocation For Hallway Bathroom (Due To Cabinet Wo

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2017 to 2027