LAHomework Sign in
Los Angeles, CA 90049 · Homewood Rd

188 Homewood Rd

Built 2024 · 9,743 sq ft
LOT 15,093 SQ FT · 1 STRUCTURE · APN 4403-007-002Lot Structure
Nothing due in the next 5 years
Here is what to keep track of. Mark things as done as they happen and your timeline stays current.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2024
Living area
9,743 sqft
Lot size
15,093 sqft
Structures on lot
1
Bedrooms
6
Bathrooms
6
Home type
Single-family
Parcel (APN)
4403-007-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

Nothing due in the next 5 years. Each system below shows its typical replacement years.
Typical replacement years
RoofLater
Expected 2044 to 2054Original, built 2024
HVACLater
Expected 2039 to 2044Original, built 2024
Water heaterLater
Expected 2034 to 2039Original, built 2024
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 80 homes on Homewood Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: [Eplan] 600A 240/120V 1Ph-3W Service, Distribution, Power, And Lighting For Sfd. Plan Check For Power. Building Wiring Permit Issued Under Building Combination Permit 21010-10000-02983.
  • 2024
    permit on fileSolar: (E-Plan) Pv1 Pc For Installation Of Roof Mounted Solar Panels. Pv System Includes 42 Modules With 42 Optimizers, 2 Central Inverter System, 2 Energy Storage System, 1 Generator, 3 Combiner Box, Connected To Existing Main Service Panel. System Size Is 17.43Kw Dc/30Kw Ac.
  • 2023
    permit on filePool: New Pool & Spa Per City Standard# 268.
  • 2023
    permit on filePlumbing: New Gas Line From Gas Meter To House
  • 2022
    permit on fileElectrical: Install (1) 200Amp O/H Single Phase 240V Meter Wit Distro 200Amp Single Phase 120/240V Main Breaker Cage With (2) 50Amp Twist Lock Receptacle For A Temporary Power Pole.

Manage this home to schedule a service or to update the timeline.