LAHomework Sign in
Pasadena, CA 91104 · E Woodlyn Rd

1850 E Woodlyn Rd

Built 1928 · 1,553 sq ft
LOT 7,462 SQ FT · 3 STRUCTURES · APN 5742-008-021Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
1,553 sqft
Lot size
7,462 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
5742-008-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 1996
Expected 2016 to 2026From the 1996 permit
20262035
HVACOn record 1996
Usually done by 2016From the 1996 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 129 homes on E Woodlyn Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: Express Permit. Upgrade 100 Amp Main Panel To 200 In Same Location
  • 2026
    permit on file, unconfirmedElectrical: Express Permit. Install A 60 A Sub Panel In Garage
  • 2026
    permit on file, unconfirmedElectrical: Express Permit. Upgrade A 100 Amp Main Panel With 200A Main Panel In Same Location Install A Ev Charger On 60 Amp 240 In Garage .
  • 2024
    permit on fileGeneral remodel: Voluntary Foundation Retrofit Per Ladbs Standard Plan Detail #7
  • 2004
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 1997
    permit on fileGeneral remodel: Deck Construction @400 S/F Subject To Field Inspection
  • 1997
    permit on filePlumbing: Run Water Line + Pump From House To Garage
  • 1996
    permit on fileRoof: Re-Roof House Only W/Genstar Ulr11656 Class A
  • 1996
    permit on fileElectrical: Install Air Conditioning Unit In The House
  • 1996
    permit on fileHeating & cooling: Install Air Conditioning Unit In The House
  • 1991
    permit on fileGeneral remodel: Eq - Repair Earthquake Damaged Chimney 3' Gable En

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2016
  • Now
    Roof replacementExpected 2016 to 2026