LAHomework Sign in
La Puente, CA 91748 · Dragonera Dr

18475 Dragonera Dr

Built 1963 · 1,379 sq ft
LOT 5,932 SQ FT · 1 STRUCTURE · APN 8258-015-055Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1963
Living area
1,379 sqft
Lot size
5,932 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
8258-015-055

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 23 homes on Dragonera Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: Main Panel Upgrade 100A To 200A/ Ev Charger Receptacle Installation (Sce Ev Home Rebate Program) *** Warning! Conductors Shall Not Exit The Back Of Any Surface Mounted Electrical Equipment; *** For Exterior Semi-Flush Mounted Electrical Equipment: Lath/Plaster Shall Not Be Installed Prior To Initial
  • 2026
    permit on file, unconfirmedElectrical: Electrical For Mini Split Cut In *** Warning! Conductors Shall Not Exit The Back Of Any Surface Mounted Electrical Equipment; *** For Exterior Semi-Flush Mounted Electrical Equipment: Lath/Plaster Shall Not Be Installed Prior To Initial Inspection; *** For Exterior Surface Mounted Electrical Equipme
  • 2024
    permit on fileHeating & cooling: Replacement Of 4 Ton Air Conditioner
  • 2022
    permit on file, unconfirmedHeating & cooling: Fau Heater Change Out- Same Location Hallway 75K Btu Linda Chen 626 380-6609
  • 2022
    permit on file, unconfirmedWater heater: 40 Gal Water Heater Change Out Same Location- Garage

Manage this home to schedule a service or to update the timeline.