LAHomework Sign in
Glendale, CA 91208 · Arvin Dr

1847 Arvin Dr

Built 1995 · 3,406 sq ft
LOT 7,609 SQ FT · 1 STRUCTURE · APN 5652-012-061Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1995
Living area
3,406 sqft
Lot size
7,609 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
5652-012-061

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2003
Expected 2023 to 2033From the 2003 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2009
Usually done by 2024From the 2009 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 22 homes on Arvin Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2010
    permit on fileGeneral remodel: Replace Front Door Only
  • 2009
    permit on filePlumbing: 1 Dishwasher
  • 2009
    permit on fileWater heater: (1) Water Heater And (1) Other Fixture *Earthquake Gas Valve
  • 2003
    permit on fileRoof: Material: Built Up Roof Class A - No. Of Squares: 22 Sqs. Sfd - Tear Of Existing (Y/N): Yes - Existing No. Of Layers: One - New Sheathing (Y/N): No - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2024
  • Now
    Roof replacementExpected 2023 to 2033