LAHomework Sign in
Los Angeles, CA 91325 · Community St

18418 Community St

Built 1979 · 2,216 sq ft
LOT 8,350 SQ FT · 1 STRUCTURE · APN 2786-022-040Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1979
Living area
2,216 sqft
Lot size
8,350 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
2786-022-040

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2025
Expected 2045 to 2055From the 2025 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2020
Expected 2030 to 2035From the 2020 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 48 homes on Community St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 22 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2025
    permit on fileSolar: Uninstallation And Reinstallaton Of Existing (29) Solar Modules Due To Re-Roofing
  • 2020
    permit on fileElectrical: (N)150A Derated Main Breaker
  • 2020
    permit on fileSolar: Adding 3.63 Kw (Dc) 3.39 Kw (Ac) To An Existing Pv System11 (N) Panels, (N) Inverter,(N) Tesla Powerwall,(N) Tesla Gateway,(N) 125A Solar Load Center,(N) 150A Derated Main Breaker.(Already Pulled Permit For Derate)
  • 2020
    permit on fileWater heater: Install Tankless Water Heater
  • 2014
    permit on file, unconfirmedSolar: Pv1 Install Roof Mounted Pv System Sized 3.8Kw Interconnected With Mai · SOLARCITY CORPORATION
  • 2014
    permit on file, unconfirmedHeating & cooling: Hvac Permit · AZ AIR CONDITIONING AND HEATING INC

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    Water heater replacementExpected 2030 to 2035