LAHomework Sign in
Los Angeles, CA 90001 · E 63rd St

1835 E 63rd St

Built 2008 · 1,782 sq ft
LOT 5,323 SQ FT · 2 STRUCTURES · APN 6009-013-020Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2008
Living area
1,782 sqft
Lot size
5,323 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
6
Bathrooms
3
Home type
Duplex (2 units)
Parcel (APN)
6009-013-020

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2021
Expected 2041 to 2051From the 2021 permit
HVACOn record 2021
Expected 2036 to 2041From the 2021 permit
Water heaterWorth a look now
Usually done by 2023From build year 2008

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 46 homes on E 63rd St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2021
    permit on filePlumbing: Replace Fixtures Bathroom Sink, Toilet, Sink
  • 2021
    permit on fileElectrical: 10 Swiches 10 Plugs 10 Outlets
  • 2021
    permit on fileRoof: Interior Remodel Fire Damage Less Than 5% Damaged Roof Repair. Patch Drywall In Bedroom From Smoke Damage.
  • 2021
    permit on fileHeating & cooling: 7 Ducts Replace Air Conditioner Already There
  • 2021
    permit on fileKitchen: Replace Kitchen Cabinets
  • 2021
    permit on filePlumbing: 1 New Vanity In Bathroom 1 New Sink

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2023