LAHomework Sign in
Acton, CA 93510 · El Dorado Dr

1815 El Dorado Dr

Built 1995 · 2,881 sq ft
LOT 50,636 SQ FT · 1 STRUCTURE · APN 3056-033-066Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1995
Living area
2,881 sqft
Lot size
1.16 acres
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
3056-033-066

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Usually done by 2025From build year 1995
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 17 homes on El Dorado Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileBathrooms: Description Master Bathroom Remodel - No Structural Changes Combo Permit. Include Electrical, Mechanical, Plumbing, Tile & Patching.
  • 2021
    permit on fileKitchen: Kitchen Remodel, Replace: Sink, G. Disposal, Dishwasher, Hood, Ice Maker, 8 Gfi, 9 Lights, 3 Switches, 8 Outlets Drywall Repair.
  • 2020
    permit on fileSolar: Installing 4.72Kw Photovoltaic System 15 Panels 1 Inverter 1 Battery Back Up 9.8Kw Please Expedite
  • 2020
    permit on fileElectrical: Installation Of (1) 5Kw Lg Chem Battery And (1) 100A Panel.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementUsually done by 2025