LAHomework Sign in
Altadena, CA 91001 · Harding Ave

1805 Harding Ave

Built 1949 · 2,256 sq ft
LOT 7,468 SQ FT · 2 STRUCTURES · APN 5854-012-039Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1949
Living area
2,256 sqft
Lot size
7,468 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5854-012-039

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 65 homes on Harding Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileKitchen: Kitchen And 2 Bathroom Remodel With Structural Changes, Change Window To Sliding Door, And Bring Fixtures Up To Code.
  • 2025
    permit on fileElectrical: Electrical For A Kitchen And 2 Bathroom Remodel With Structural Changes, Change Window To Sliding Door, And Bring Fixtures Up To Code.
  • 2025
    permit on filePlumbing: Plumbing For A Kitchen And 2 Bathroom Remodel With Structural Changes, Change Window To Sliding Door, And Bring Fixtures Up To Code.
  • 2022
    permit on fileSolar: Roof-Mounted Solar Installation, 20 Modules, 5 Microinverters, 9 Kw Dc Size
  • 2022
    permit on fileElectrical: Sub-Panel 125 Amps.
  • 2018
    permit on filePlumbing: Copper/Pex Repipe 12 Fixtures & New Water Main

Manage this home to schedule a service or to update the timeline.