LAHomework Sign in
Los Angeles, CA 91325 · Roscoe Blvd

17930 Roscoe Blvd

Built 1954 · 3,220 sq ft
LOT 7,105 SQ FT · 2 STRUCTURES · APN 2101-019-009Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1954
Living area
3,220 sqft
Lot size
7,105 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
9
Bathrooms
6
Home type
Single-family
Parcel (APN)
2101-019-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2020
Expected 2035 to 2040From the 2020 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 339 homes on Roscoe Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileElectrical: Upgrade 400 Amp 3 Gang To Service 17930 W. Roscoe. 17930 1/2 Roscoe Blvd And 17932 Roscoe Blvd
  • 2022
    permit on filePlumbing: One Lavratory Sink
  • 2021
    permit on fileRoom addition: Convert 12' X 33'-9" Portion Of (E) Sfd Into A (N) Jr. Accessory Dwelling Unit Per Gcs65852.2(E)(1)(A) And 65852.22.
  • 2021
    permit on fileRoom addition: Convert (E)Storage Into Adu. Enlarge Carport On 1St Floor And Add Adu On 2Nd Floor.
  • 2021
    permit on file, unconfirmedSolar: Pv1 Plan Check For New Roof Mounted Pv System. System Size Is 4.08 Kw Dc/3.8 Kw Ac. Scope Of Work Consists Of (12) Pv Modules With Optimizers And A Inverter
  • 2021
    permit on file, unconfirmedSolar: Installation Of Roof-Mounted Solar Pv System, Not Exceeding A Total Ac Output Of 10 Kw, In A 1 Or 2 Family Dwelling
  • 2021
    permit on file, unconfirmedElectrical: 225A Main Service Panel200A Main Circuit Breaker
  • 2021
    permit on fileElectrical: Perform All Trenching, Concrete And Erection Needed For A Temporary Pole And Connect The Main House To The Main Line.
  • 2021
    permit on filePlumbing: Replace The Main Drain Connecting To The Main Line.
  • 2020
    permit on fileRoom addition: 12'-0" X 33'-9" Addition To Rear Of (E) Sfd And Convert (1) Bedroom To Den. All Work Done Per Wfpp.
  • 2020
    permit on fileGeneral remodel: Replace Drywall/Plaster (Patch And Paint). Non-Structural Repair Only.
  • 2020
    permit on fileHeating & cooling: New Wall Unit
  • 2020
    permit on filePlumbing: Replace Portion Of Existing Drain Pipe
  • 2018
    permit on fileElectrical: Electrical Permit · OWNER-BUILDER

Manage this home to schedule a service or to update the timeline.