LAHomework Sign in
Carson, CA 90746 · Sandlake Ave

17503 Sandlake Ave

Built 1977 · 2,406 sq ft
LOT 3,958 SQ FT · 1 STRUCTURE · APN 7319-031-017Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1977
Living area
2,406 sqft
Lot size
3,958 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
7319-031-017

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2026
Expected 2041 to 2046From the 2026 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 36 homes on Sandlake Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: (1) 220V Branch Circuit
  • 2026
    permit on fileHeating & cooling: Install (1) Furnace Up To 100K Btu, (1) Ac Up To 100K Btu, (1) Air Handling Unit Up To 2K Cfm, (1) Air Inlet/Outlet, (1) Alt Of Existing Duct System
  • 2026
    permit on fileElectrical: 200A Panel Upgrade And 60A Ev Charger Located In Garage On Side Wall.
  • 2025
    permit on fileSolar: 9.430Kw Roof Mounted Solar With 23 Modules And 1 Tesla Integrated Solar Battery

Manage this home to schedule a service or to update the timeline.