LAHomework Sign in
Los Angeles, CA 91316 · Tiara St

17413 Tiara St

Built 1949 · 1,048 sq ft
LOT 5,571 SQ FT · 3 STRUCTURES · APN 2254-032-003Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1949
Living area
1,048 sqft
Lot size
5,571 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
2254-032-003

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2015
Expected 2035 to 2045From the 2015 permit
20262035
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 84 homes on Tiara St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileRoom addition: Eplan Convert Existing Detached Garage Into An Accessory Dwelling Unit Per Ca Govt. Code65852.2(E)(1)(A)
  • 2025
    permit on filePool: New Pool With Attached Spa
  • 2025
    permit on fileGeneral remodel: Eplansupplemental To 24014-10000-04811 Increase In Approved Height Of Building By 1.5 Inches Per Height Survey. Requested By Inspector.
  • 2025
    permit on fileElectrical: 100Amp Temporary Power Pole
  • 2025
    permit on fileElectrical: 15 Plugs5 Switches 15 Circuit Breakers 200 Amp Sub Panel
  • 2025
    permit on fileElectrical: Install An Electrical Vehicle Charger(S) In A Single-Family Dwelling.
  • 2025
    permit on fileHeating & cooling: Install 1.5 Ton Unit At Adu
  • 2025
    permit on filePlumbing: Plumbing For Adu
  • 2024
    permit on fileRoom addition: Eplan. Second Story Addition And Remodel Of Existing Single Family Dwelling With New Attached Open Trellis Patio***13D Sprinkler Required***
  • 2016
    permit on fileElectrical: Electrical Permit · SOLARCITY CORPORATION
  • 2015
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. · VALLEY ROOFING
  • 2014
    permit on file, unconfirmedElectrical: Electrical Permit · D B CONSULTANTS
  • 2014
    permit on file, unconfirmedPlumbing: Plumbing Permit · D B CONSULTANTS

Manage this home to schedule a service or to update the timeline.