LAHomework Sign in
Pasadena, CA 91104 · Casa Grande St

1719 Casa Grande St

Built 1924 · 2,118 sq ft
LOT 13,383 SQ FT · 5 STRUCTURES · APN 5742-015-019Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
2,118 sqft
Lot size
13,383 sqft
Structures on lot
5 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
2
Home type
Single-family
Parcel (APN)
5742-015-019

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2019
Expected 2039 to 2049From the 2019 permit
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 183 homes on Casa Grande St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on filePlumbing: Online Adu: Install Plumbing For Proposed Conversion Of (E) Permitted Garage To An Adu And Add 98 Sf = Total Adu 749 Sf
  • 2022
    permit on fileHeating & cooling: Online Adu:Install Mechanical For Proposed Conversion Of (E) Permitted Garage To An Adu And Add 98 Sf = Total Adu 749 Sf
  • 2022
    permit on fileElectrical: Online Adu: Install Electrical For Proposed Conversion Of (E) Permitted Garage To An Adu And Add 98 Sf = Total Adu 749 Sf
  • 2022
    permit on fileRoom addition: Online Adu: Proposed Conversion Of (E) Permitted Garage To An Adu And Add 98 Sf = Total Adu 749 Sf
  • 2021
    permit on fileBathrooms: Turna A Walk-In Closet Into A Bath @ 8' X 10". - Interior Only, No Windows.
  • 2021
    permit on fileElectrical: Electrical For Remodel Walk-In Closet Into Bath
  • 2021
    permit on filePlumbing: Plumbing For Remodel Walk-In Closet Into Bath
  • 2021
    permit on fileHeating & cooling: Mechanical For Remodel Walk-In Closet Into Bath
  • 2019
    permit on fileRoof: Partial Re-Frame Of Roof At 2Nd Flr (Over Master Bedroom) From Flat To Slope (3:12) @ 308 S/F Of Roof Area.
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 1996
    permit on fileElectrical: Install New 4 Circuit Panel + Fixtures For Garage
  • 1996
    permit on filePlumbing: Install Plumbing Fixtures For Garage
  • 1995
    permit on fileGeneral remodel: Construction Of New Garage 30 X 20
  • 1991
    permit on fileElectrical: El - Upgrade Service + Electrical Wiring

Manage this home to schedule a service or to update the timeline.