LAHomework Sign in
Glendale, CA 91201 · Bel Aire Dr

1714 Bel Aire Dr

Built 1941 · 2,108 sq ft
LOT 7,550 SQ FT · 2 STRUCTURES · APN 5622-018-005Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1941
Living area
2,108 sqft
Lot size
7,550 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
5622-018-005

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2004
Expected 2024 to 2034From the 2004 permit
20262035
HVACOn record 2001
Usually done by 2021From the 2001 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 92 homes on Bel Aire Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2004
    permit on fileRoof: Material:Class A - No. Of Squares:10 - Tear Off Existing (Y/N):Y - Existing No. Of Layers:1 - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -
  • 2001
    permit on fileHeating & cooling: Two Gas System, Two Appliance Vent, Two Furnances 70000, And Two A/C 3 Hp.

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2021
  • Now
    Roof replacementExpected 2024 to 2034