LAHomework Sign in
Los Angeles, CA 90272 · Donna Ynez Ln

16925 Donna Ynez Ln

Built 1962 · 2,016 sq ft
LOT 15,296 SQ FT · 1 STRUCTURE · APN 4419-018-033Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1962
Living area
2,016 sqft
Lot size
15,296 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
4419-018-033

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 8 homes on Donna Ynez Ln →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedGeneral remodel: Change In Contractor From Psg Construction Co, License #1079377 To Blueprint Development Inc, License #1155022.
  • 2026
    permit on file, unconfirmedSolar: [E-Plan] 2025 Wild Fire Project - (Red Tag) - Pv1 For Installation Of Roof Mounted Solar Panels And Installation Of Energy Storage System. Pv System Includes 14 Modules, Powerwall3 Hybrid, Tesla Gateway Connected To Existing Main Service Panel. System Size Is 6.44Kw Dc/11.5Kw Ac.Permit Fees Are Calc
  • 2025
    permit on file, unconfirmedElectrical: Temp Power Pole
  • 2023
    permit on fileSolar: 01-04-2022 Changes To An Approved Set Of Plan, Changes Include Additional Sub-Panel And Updated The Sub-Panel To 125A. All Changes Has Been Clouded. ***********Previouse Work Description*************[Eplan][Pv1]Installation Of A New 6.4Kw Dc/ 4.64Kwac Pv System With 16 Modules And 16 Microinverters,
  • 2023
    permit on fileSolar: Eplan, Installation Of (1) Tesla Powerwall Ess. To Connect To Existing 6.4Kw Pv System (22041-10000-57702)
  • 2022
    permit on fileSolar: [Eplan][Pv1]Installation Of A New 6.4Kw Dc/ 4.64Kwac Pv System With 16 Modules And 16 Microinverters, (1) Combiner Box, And (1) Gateway Interconnecting Through The Main Service Panel.
  • 2020
    permit on fileElectrical: Replace Main Service Panel Due To Failure Of Main Circuit Breaker.
  • 2017
    permit on file, unconfirmedPlumbing: Plumbing Permit · TRI - STATE RETROFITTERS INC

Manage this home to schedule a service or to update the timeline.