LAHomework Sign in
Altadena, CA 91001 · E Altadena Dr

1689 E Altadena Dr

Built 1928 · 3,695 sq ft
LOT 16,677 SQ FT · 2 STRUCTURES · APN 5844-028-012Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
3,695 sqft
Lot size
16,677 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
5844-028-012

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 206 homes on E Altadena Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileElectrical: Electrical For Minisplit Hp Change Out - Whip, Disconnect, Breaker
  • 2023
    permit on fileHeating & cooling: Minisplit Heat Pump Change Out Of Existing In Same Location, Like For Like, For Backhouse. Minisplit Hp On Roof, 18 Seer, 1.5 Ton, 8 Hspf.
  • 2020
    permit on fileElectrical: Back Up Generator
  • 2020
    permit on filePlumbing: Install 60' Of 1-1/4" Gas Line From Meter To Front Of House.

Manage this home to schedule a service or to update the timeline.