LAHomework Sign in
Los Angeles, CA 91436 · Adlon Rd

16850 Adlon Rd

Built 1958 · 3,094 sq ft
LOT 15,250 SQ FT · 1 STRUCTURE · APN 2291-011-040Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1958
Living area
3,094 sqft
Lot size
15,250 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
4
Home type
Single-family
Parcel (APN)
2291-011-040

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 76 homes on Adlon Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 28 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2023
    permit on fileSolar: [Eplan] Pv1 New Rooftop Mounted System, System Size Is 10Kwac, System Includes 16 Modules With Optimzers And A Central Inverter And A New Ess And A New 125A Panel For Backup Loads, System Is Interconnected To A New 225A Msp Via An Midnote Mpu Shall Be Under Seperate Express Permit
  • 2023
    permit on fileElectrical: New 225A Mpu & New 125A Backup Loads Panel
  • 2021
    permit on fileBathrooms: Interior Bathroom Remodel/Repair (No Changes In Walls Or Openings).
  • 2016
    permit on file, unconfirmedHeating & cooling: Hvac Permit · AROUND THE CLOCK HEATING A/C & REFRIGERATION INC
  • 2016
    permit on file, unconfirmedElectrical: Electrical Permit · AROUND THE CLOCK HEATING A/C & REFRIGERATION INC

Manage this home to schedule a service or to update the timeline.