- 2026
permit on file, unconfirmedGeneral remodel: New Detached 4-Car Garage. (E-Plan Bs2400897)
- 2026
permit on file, unconfirmedElectrical: New Detached 4-Car Garage
- 2026
permit on file, unconfirmedPlumbing: New Detached 4-Car Garage
- 2026
permit on file, unconfirmedElectrical: (Eplan) 2Nd Flr - Proposing To Add An Additional Floor To The Approved Detached Adu. The Third Floor Will Be The Same Layout As The Approved Adu Layout.
- 2026
permit on file, unconfirmedHeating & cooling: (Eplan) 2Nd Flr - Proposing To Add An Additional Floor To The Approved Detached Adu. The Third Floor Will Be The Same Layout As The Approved Adu Layout.
- 2026
permit on file, unconfirmedPlumbing: (Eplan) 2Nd Flr - Proposing To Add An Additional Floor To The Approved Detached Adu. The Third Floor Will Be The Same Layout As The Approved Adu Layout.
- 2026
permit on file, unconfirmedRoom addition: Proposing To Add An Additional Floor To The Approved Detached Adu. The Third Floor Will Be The Same Layout As The Approved Adu Layout. (E-Plans Review Under P/N Bs2400897)
- 2026
permit on file, unconfirmedSolar: (Eplan) 2 Independent Roof-Mounted Pv Systems On A New Adu. System 1 Includes 5 Modules Connected To Its Own Msp & Utility Meter. System 2 Includes 6 Modules Connected To A Separate Msp & Utility Meter. Total Of 11 Modules Installed On The Same Roof.
- 2025
permit on file, unconfirmedHeating & cooling: New Accessory Dwelling Unit
- 2025
permit on file, unconfirmedElectrical: New Accessory Dwelling Unit
- 2025
permit on file, unconfirmedPlumbing: New Accessory Dwelling Unit
- 2025
permit on file, unconfirmedRoom addition: (E-Plan) New Accessory Dwelling Unit (Includes Plans For Garage Below Bs2407207)
- 2025
permit on file, unconfirmedElectrical: Remodel Of Unit 3. Replace (21) Windows. Install (10) Foundation Pads And Related Structural Members. -Stop Work Order. Fees Apply. 90-Day Permits. (Cp2500387)
- 2025
permit on file, unconfirmedHeating & cooling: Remodel Of Unit 3. Replace (21) Windows. Install (10) Foundation Pads And Related Structural Members. -Stop Work Order. Fees Apply. 90-Day Permits. (Cp2500387)
- 2025
permit on file, unconfirmedPlumbing: Remodel Of Unit 3. Replace (21) Windows. Install (10) Foundation Pads And Related Structural Members. -Stop Work Order. Fees Apply. 90-Day Permits. (Cp2500387)
- 2024
permit on file, unconfirmedGeneral remodel: (E-Plan) Remodel Units 1,2,4. Layout Change. Demo And Replace (11) Windows.
- 2024
permit on file, unconfirmedHeating & cooling: Remodel Units 1,2,4
- 2024
permit on file, unconfirmedElectrical: Remodel Units 1,2,4
- 2024
permit on file, unconfirmedPlumbing: Remodel Units 1,2,4
Manage this home to schedule a service or to update the timeline.