LAHomework Sign in
Beverly Hills, CA 90211 · N Arnaz Dr

166 N Arnaz Dr

Built 1933 · 3,504 sq ft
LOT 6,474 SQ FT · 2 STRUCTURES · APN 4334-010-043Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1933
Living area
3,504 sqft
Lot size
6,474 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
8
Home type
Duplex (2 units)
Parcel (APN)
4334-010-043

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 40 homes on N Arnaz Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on file, unconfirmedRoom addition: (E-Plan) Convert Attached Guest Room To Adu (90 Day Permit, Cp2200501)
  • 2025
    permit on file, unconfirmedElectrical: Convert Attached Guest Room To Adu (90 Day Permit, Cp2200501)
  • 2025
    permit on file, unconfirmedHeating & cooling: Convert Attached Guest Room To Adu (90 Day Permit, Cp2200501)
  • 2025
    permit on file, unconfirmedPlumbing: Convert Attached Guest Room To Adu (90 Day Permit, Cp2200501)
  • 2025
    permit on file, unconfirmedElectrical: Electrical Work To Install A New Meter - 166 No. Arnaz
  • 2025
    permit on file, unconfirmedElectrical: Electrical Work To Install A New Meter - 166 1/2 No. Arnaz
  • 2025
    permit on file, unconfirmedElectrical: Unit A - Electrical Work To Install A New Meter
  • 2023
    permit on file, unconfirmedKitchen: Interior Remodel Layout Changes In Kitchen Convert Half Bath To Full Bath. Replace (13) Windows. Replace Heating And Add Air Conditioning (90 Days Cp2200506, Cp2200501) Ref. Bs2204130
  • 2023
    permit on file, unconfirmedElectrical: Interior Remodel Layout Changes In Kitchen Convert Half Bath To Full Bath. Replace Three Windows. Replace Heating And Add Air Conditioning (90 Days Cp2200506, Cp2200501) Ref. Bs2204131
  • 2023
    permit on file, unconfirmedHeating & cooling: Interior Remodel Layout Changes In Kitchen Convert Half Bath To Full Bath. Replace Three Windows. Replace Heating And Add Air Conditioning (90 Days Cp2200506, Cp2200501) Ref. Bs2204132
  • 2023
    permit on file, unconfirmedPlumbing: Interior Remodel Layout Changes In Kitchen Convert Half Bath To Full Bath. Replace Three Windows. Replace Heating And Add Air Conditioning (90 Days Cp2200506, Cp2200501) Ref. Bs2204133

Manage this home to schedule a service or to update the timeline.