LAHomework Sign in
Glendale, CA 91208 · Don Carlos Ave

1638 Don Carlos Ave

Built 1926 · 2,409 sq ft
LOT 13,687 SQ FT · 2 STRUCTURES · APN 5614-006-008Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1926
Living area
2,409 sqft
Lot size
13,687 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5614-006-008

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2002
Expected 2022 to 2032From the 2002 permit
20262035
HVACOn record 2020
Expected 2035 to 2040From the 2020 permit
20262035
Water heaterOn record 2010
Usually done by 2025From the 2010 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 36 homes on Don Carlos Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2020
    permit on fileHeating & cooling: 1 Fau Up To 100,000 Btu, 1 Up To And Including 3Hp, 1 Evaporative System.Like For Like, A/C On Ground. Not A Rooftop Equipment.
  • 2010
    permit on fileWater heater: R/R (1) Water Heater.
  • 2003
    permit on filePlumbing: Plumbing Permit (Legacy) / Plumbing Permit (Legacy)
  • 2002
    permit on fileRoof: Material: Fiber Slate Class A - No. Of Squares: 30 Sqs. - Tear Of Existing (Y/N): Yes - Existing No. Of Layers: Two -Wood - New Sheathing (Y/N): Yes - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existin

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2025
  • Now
    Roof replacementExpected 2022 to 2032