LAHomework Sign in
Los Angeles, CA 90049 · Sloan Dr

16341 Sloan Dr

Built 2001 · 3,616 sq ft
LOT 10,065 SQ FT · 1 STRUCTURE · APN 4490-004-015Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2001
Living area
3,616 sqft
Lot size
10,065 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
5
Home type
Single-family
Parcel (APN)
4490-004-015

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2021 to 2031From build year 2001
20262035
HVACWorth a look now
Usually done by 2021From build year 2001
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 24 homes on Sloan Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2022
    permit on fileGeneral remodel: Change Out The Windows On The North Side Per Engineer'S Design And Detailing. Comply With Department Order Effective Date08/27/2021. Permit Will Expire 30 Days From Issuance Date".
  • 2021
    permit on fileKitchen: Replace 18 Window(S). Same Size, Location, Number, Type. Interior Kitchen Remodel/Repair (No Changes In Walls Or Openings). Interior Bathroom Remodel/Repair (No Changes In Walls Or Openings).

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2021
  • Now
    Roof replacementExpected 2021 to 2031