LAHomework Sign in
Glendale, CA 91208 · Capistrano Ave

1631 Capistrano Ave

Built 1941 · 2,398 sq ft
LOT 13,851 SQ FT · 2 STRUCTURES · APN 5614-009-017Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1941
Living area
2,398 sqft
Lot size
13,851 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Single-family
Parcel (APN)
5614-009-017

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2011
Expected 2031 to 2041From the 2011 permit
20262035
HVACOn record 2015
Expected 2030 to 2035From the 2015 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 47 homes on Capistrano Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2015
    permit on filePool: New 12 X 34 Ft Pool, 14000Gal Est Capacity, D.E. Filter And Back Wash
  • 2015
    permit on fileHeating & cooling: 1 Kitchen Hood On The Island
  • 2015
    permit on filePlumbing: 1 Low Pressure Gas Outlet
  • 2015
    permit on fileHeating & cooling: Work Related To Guest House Permit Bcb1426341 1 Fau Up 100000Btu, 1 Up 3Hp Motor
  • 2015
    permit on fileRoom addition: Guest House Addition 500 Sq Ft @ Rear Of The Lot New Or Relocated Hvac Or Electrical Service Requires Separate Permits.
  • 2015
    permit on fileRoom addition: New Mstr Bed & Bath Addition, Laundry & Entry Hall Addition W/ Remodeling & Replace All Windows Same Size & Style Total Of 697 S.F. Remodel Kitchen This Permit Issued To Complete Work Under Expired Permit Bcb1309206. Includes Trades New Or Relocated Hvac Or Electrical Service Requires Separate Permi
  • 2015
    permit on fileRoom addition: New Or Relocated Hvac Or Electrical Service Requires Separate Permits. Proposed 589 S.F. Single-Story Addition To Rear Of Existing 1-Story Sfd And New W.I. Gates(3) At Front.
  • 2013
    permit on fileRoom addition: New Mstr Bed & Bath Addition, Laundry & Entry Hall Addition W/ Remodeling & Replace All Windows Same Size & Style Total Of 697 S.F. Remodel Kitchen Includes Trades New Or Relocated Hvac Or Electrical Service Requires Separate Permits.
  • 2013
    permit on fileElectrical: 1 200 Amp Service
  • 2013
    permit on fileRoom addition: Request To Provide A Modified Soil Report For 697 Sf Single Story Addition Adjacent To A Basement Located In A Wuia. Justification For Request: Wall Loads And Posts Loads Are Light. Allow Soils Brg. Value Used Is Min. That Are Accepted Bedore Footing Sizes Provided Are Conservative. See Conditions F
  • 2012
    permit on fileElectrical: One New Branch Circuit For New Outlets.
  • 2011
    permit on fileRoof: Residential Reroof As Follows: Sfd This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Tile Squares (100 Sf) Being Installed: 20 Tear Off Existing (Y/N): Yes Existing Layers Of Roofing: 1 New Sheathing Being Installed (Y/N): No High Fire Hazard Zone (Y/N): Yes All Tear-Offs Req
  • 2011
    permit on fileRoof: Residential Reroof As Follows: Detached Garage This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Tile Squares (100 Sf) Being Installed: 5 Tear Off Existing (Y/N): Yes Existing Layers Of Roofing: 1 New Sheathing Being Installed (Y/N): No High Fire Hazard Zone (Y/N): Yes All Te

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2030
    HVAC replacementExpected 2030 to 2035
  • 2031
    Roof replacementExpected 2031 to 2041