LAHomework Sign in
Los Angeles, CA 90501 · W 227th St

1625 W 227th St

Built 1953 · 951 sq ft
LOT 7,171 SQ FT · 2 STRUCTURES · APN 7347-010-022Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1953
Living area
951 sqft
Lot size
7,171 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
7347-010-022

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 147 homes on W 227th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: [Eplan] Plan Check For Methane Detection Systemfire Approval On Separate Plan Set.
  • 2025
    permit on filePlumbing: Potable Water System Only. 1.5" Domestic Water Meter And No Bfp.
  • 2024
    permit on fileElectrical: New 4 Units Apartment Building With 400A 120/240V 1Ph 3W Main Switchboard, New Panels, Unit Lighting, Receptacles And Branch Circuits
  • 2024
    permit on file, unconfirmedElectrical: New 4 Unit Project With 400Amps 120/240V 1 Ph 3W Main Switchboard, New Panels, Unit Lighting, Receptacles, Branch Circuits. Total Connected Load Cannot Exceed 400Amps
  • 2024
    permit on filePlumbing: Potable Water And Waste/Vent
  • 2024
    permit on filePlumbing: Methane Mitigation Level V
  • 2024
    permit on fileHeating & cooling: General Hvac For Heating And Cooling. Four (4) 3-Ton Split Heat Pump Systems
  • 2024
    permit on filePlumbing: Hose
  • 2023
    permit on file, unconfirmedElectrical: 200Amp Temp Power Pole, 20Amp Circuit, 50Amp Circuit

Manage this home to schedule a service or to update the timeline.