LAHomework Sign in
Los Angeles, CA 90027 · Winona Blvd

1615 Winona Blvd

Built 1912 · 2,568 sq ft
LOT 6,722 SQ FT · 2 STRUCTURES · APN 5544-015-021Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1912
Living area
2,568 sqft
Lot size
6,722 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
3
Home type
Duplex (2 units)
Parcel (APN)
5544-015-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2022
Expected 2032 to 2037From the 2022 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 63 homes on Winona Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: Install 125 Amp 120/240 Volt Sub Panel For Unit 1615Install 125 Amp 120/240 Volt Sub Panel For Unit 1617
  • 2024
    permit on fileElectrical: Install 400 Amp Switch Disconnect For Four Units Apartment Install 4 Gang Meter Panel For Four Units Apartment Install Two 125 Amp 120/240 Volt Sub Panels For Unit 1615 And Unit 1617.
  • 2024
    permit on fileElectrical: Install 400 Amp Switch Disconnect And 4 Gang Meter Panel For Two Duplex Dwellings. Install 125 Amp 120/240 Volt Sub Panels For Units 1615 And 1617.
  • 2023
    permit on fileElectrical: Install 120/240 Volt 100 Amp Temporary Pole
  • 2023
    permit on fileElectrical: Install 400 Amp 4 Gang Meter Panel Install 100 Amp 220 Volt Circuit From Temporary Power Pole To Existing House Install Two 100 Amp 220 Volt Sup Panel Install 20 Amp 120 Volt 28 Circuitsinstall 8 Smog Detectors Install 100 Amp 220 Volt Two Switch Disconnect Install Underground Pipes, 80 Feet
  • 2022
    permit on fileWater heater: Install New Tankless Water Heater
  • 2021
    permit on fileGeneral remodel: Remove Existing Stair At Rear. Enclose Existing Floor Opening

Manage this home to schedule a service or to update the timeline.