LAHomework Sign in
Glendale, CA 91208 · Del Valle Ave

1611 Del Valle Ave

Built 1936 · 2,416 sq ft
LOT 9,601 SQ FT · 2 STRUCTURES · APN 5614-006-019Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1936
Living area
2,416 sqft
Lot size
9,601 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5614-006-019

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2000
Expected 2020 to 2030From the 2000 permit
20262035
HVACOn record 2011
Expected 2026 to 2031From the 2011 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 34 homes on Del Valle Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileGeneral remodel: Replacing 7 Windows With No Change To Size Or Location
  • 2023
    permit on fileElectrical: Downsize Main Breaker To 150A
  • 2023
    permit on fileSolar: 13.5Kwh Energy Storage System. Downsize Main Breaker To 150A
  • 2022
    permit on filePool: 15X28 Pool With Auto Cover.
  • 2021
    permit on fileSolar: Solar 8.64 Kw Dc Solar Photovoltic System
  • 2021
    permit on fileGeneral remodel: Exempt From Soils Report Flat Area
  • 2011
    permit on fileHeating & cooling: 1 Heating Appliance, 1 Air Conditioning Backyard, 1 Electrical A/C, 1 Connection To Gas
  • 2011
    permit on fileKitchen: New Or Relocated Hvac Or Electrical Service Requires Separate Permits. Add Master Bath, Add To Enlarge Kitchen/Family Room, Alter Enclosed Patio Area (Bedroom)
  • 2010
    permit on fileGeneral remodel: Request: To Not Provide Soil Report Justification: 492 Sf Add Liquefaction Zone, Fire Zone 4 See Conditions For Conditions Of Approval
  • 2006
    permit on fileHeating & cooling: 1 Fau Up To 100000Btu, 1 3 To 15Hp Motor, 1 Electrical A/C & Compressor. Double Fee Applied Per Mbrennan
  • 2004
    permit on fileElectrical: 1 200A Service
  • 2000
    permit on fileRoof: Material:Comp Shingle - No. Of Squares:22 Sq - Tear Of Existing (Y/N):Y - Existing No. Of Layers:2 - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2020 to 2030
  • Now
    HVAC replacementExpected 2026 to 2031