LAHomework Sign in
Los Angeles, CA 91406 · Gault St

15932 Gault St

Built 1952 · 2,416 sq ft
LOT 10,451 SQ FT · 2 STRUCTURES · APN 2224-008-038Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1952
Living area
2,416 sqft
Lot size
10,451 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
2224-008-038

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2018
Expected 2038 to 2048From the 2018 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 120 homes on Gault St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2019
    permit on fileElectrical: Electrical Permit · SIRE ENERGY INC
  • 2019
    permit on file, unconfirmedElectrical: Electrical Permit · SIRE ENERGY CONSTRUCTION
  • 2018
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. · HOME DEPOT U S A INC
  • 2018
    permit on file, unconfirmedSolar: Plan Check For Pv Roof Mounted System, System Size: 14.52Kw Ac Cec, 13 · SIRE ENERGY INC

Manage this home to schedule a service or to update the timeline.