LAHomework Sign in
Los Angeles, CA 90501 · W 222nd St

1544 W 222nd St

Built 1952 · 812 sq ft
LOT 7,168 SQ FT · 2 STRUCTURES · APN 7346-020-007Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1952
Living area
812 sqft
Lot size
7,168 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
7346-020-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 107 homes on W 222nd St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedSolar: [E-Plan] Roof-Mounted Solar Pv System.System Size: 2.7Kw Dc, 11.5Kw Ac(6) 450W Modules(1) 11.5Kw Ac Hybrid Ess(1) 200A Energy Management Panel(1) 200A Backup Loads Panel *** Applicant Work Description Below: *** New Rooftop Solar Installation 2.7 Kw, (6) Modules, (1) Hybrid Battery. 225 A Main Panel
  • 2026
    permit on file, unconfirmedElectrical: Main Panel Upgrade: Existing 100 Amp Main Panel With 100 Amp Main Breaker To Be Replaced With New 200 Amp Main Panel With 200 Amp Main Breaker And 225 Amp Busbar.
  • 2020
    permit on fileElectrical: Install Gfci Outlets
  • 2020
    permit on filePlumbing: Install Earthquake Gas Shutoff Vlave

Manage this home to schedule a service or to update the timeline.