LAHomework Sign in
Los Angeles, CA 90062 · W 46th St

1541 W 46th St

Built 1912 · 1,650 sq ft
LOT 5,970 SQ FT · 2 STRUCTURES · APN 5016-008-025Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1912
Living area
1,650 sqft
Lot size
5,970 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5016-008-025

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2024
Expected 2039 to 2044From the 2024 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 117 homes on W 46th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedElectrical: Main Panel Replacement: Existing 100 Amp Mainpanel With 100 Amp Main Breaker To Be Replaced Withnew 225 Amp Main Panel With 125 Amp Main Breaker. Trenching Required: Ac & Dc Wire To Be Trenched23 Ft In Concrete Material. Minimum Trench Depth 21" New 225 Amp Backup Panel To Be Installed.
  • 2026
    permit on file, unconfirmedSolar: (Eplan) Pv1 For Installation Of Roof Mounted Solar Panels And Installation Of Energy Storage System. Pv System Includes 16 Modules, 1 Powerwall3 Hybrid, 1 Tesla Gateway, Subpanel Connected To New Main Service Panel. System Size Is 2.4Kw Dc/11.5Kw Ac
  • 2024
    permit on fileElectrical: New 220V For Air Handler
  • 2024
    permit on fileHeating & cooling: Hvac Changeout. Like For Like. (1) 4 Ton Heat Pump Condenser To Be Placed In Backyard. (1) 88K Btu Furnace To Be Placed In Basement. (1) Duct System (0 Supply, 1 Return)
  • 2022
    permit on fileKitchen: Interior Kitchen Remodel/Repair (No Changes In Walls Or Openings). Interior Bathroom Remodel/Repair (No Changes In Walls Or Openings).
  • 2014
    permit on file, unconfirmedGeneral remodel: Change Out 11 Windows And 2 Doors (Same Size & Type For Residential Bu · STINSON MECHANICAL CONTRACTORS
  • 2014
    permit on filePlumbing: Plumbing Permit · STINSON MECHANICAL CONTRACTORS
  • 2014
    permit on file, unconfirmedElectrical: Electrical Permit · STINSON MECHANICAL CONTRACTORS
  • 2014
    permit on fileHeating & cooling: Hvac Permit · STINSON MECHANICAL CONTRACTORS
  • 2014
    permit on filePlumbing: Plumbing Permit · SPECIAL ASSET MANAGEMENT INC
  • 2014
    permit on file, unconfirmedElectrical: Electrical Permit · SPECIAL ASSET MANAGEMENT INC
  • 2014
    permit on fileHeating & cooling: Hvac Permit · SPECIAL ASSET MANAGEMENT INC

Manage this home to schedule a service or to update the timeline.