LAHomework Sign in
Glendale, CA 91201 · Irving Ave

1538 Irving Ave

Built 1939 · 2,166 sq ft
LOT 9,725 SQ FT · 2 STRUCTURES · APN 5622-012-006Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1939
Living area
2,166 sqft
Lot size
9,725 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5622-012-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2004
Expected 2024 to 2034From the 2004 permit
20262035
HVACOn record 2022
Expected 2037 to 2042From the 2022 permit
Water heaterOn record 2024
Expected 2034 to 2039From the 2024 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 204 homes on Irving Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileGeneral remodel: 1. Add Sill Plate Anchor Bolts And Plywood To Cripple Walls (If Existing) Per La City Standard Plan #1; No Foundation Replacement (Earthquake Hazard Reduction Per Chapter 92 Of The Los Angeles Building Code). (Houses, Residential Buildings Up To 3 Stories And Up To 4 Units). 2. Add Sill Plate Anchor
  • 2024
    permit on fileElectrical: Service Upgrade To 225 Amp Panel. Location In Rear Of Garage In Backyard Area (Same As Current Panel And Drop). Glendale Water & Power Has Approved Spot, Their Fees Have Been Paid.
  • 2024
    permit on fileWater heater: Trade Out Existing Gas Tank Water Heater For 50 Gallon Bradford White Electric Tank Water Heater
  • 2024
    permit on fileElectrical: Replace Old Gas Water Heater With New 50 Gallon Bradford White Electric Water Heater
  • 2023
    permit on fileKitchen: Remodel Of Existing Kitchen, 1 Full Bathroom And Laundry Area Within Existing Residential Structure. Install 2 New Windows And 1 New Door At Rear Elevation.
  • 2022
    permit on fileGeneral remodel: Alteration Of Interior Door. Remove Of A Portion Of A Load Bearing Wood Stud Wall Between Breakfast Room And Dining Room
  • 2022
    permit on fileHeating & cooling: 1 Fau Up To 100,000 Btu, 1 Air Handler, 1 Up To And Including 3Hp, 1 Duct. Replacing Like To Like Split System, Condenser In The Back Of Property
  • 2004
    permit on fileRoof: Material: Class A, Comp Shingle - No. Of Squares: 30 - Tear Off Existing (Y/N): Y - Existing No. Of Layers: 1 - New Sheathing (Y/N): Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheat
  • 2004
    permit on fileRoof: Material: Class A, Comp Shingle - No. Of Squares: 3 - Tear Off Existing (Y/N): Y - Existing No. Of Layers: 1 - New Sheathing (Y/N): Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheath

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2024 to 2034