LAHomework Sign in
Los Angeles, CA 90002 · E 89th St

1531 E 89th St

Built 1910 · 1,010 sq ft
LOT 5,540 SQ FT · 1 STRUCTURE · APN 6044-004-041Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1910
Living area
1,010 sqft
Lot size
5,540 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6044-004-041

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2026
Expected 2041 to 2046From the 2026 permit
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 209 homes on E 89th St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on filePlumbing: New Adu Sewer Connecting To Front Of The House Sewer Connection Main In The Front Drainage Before The Street Inside Main Property Home, Connection Will Be Made In The Front Meet.
  • 2026
    permit on fileHeating & cooling: 1200 2 Story, 3 Car Garage, Adu Containing 3 Bedrooms 2 Bathrooms With New Condenser And Furnace.
  • 2026
    permit on fileElectrical: Replacement Of Existing Panel Upgrade To New
  • 2026
    permit on filePlumbing: New Construction Adu 1,200 Square Feet Living 2 Story, 3-Car Garage; 3 Bedrooms, 2 Bathrooms Plumbing To Be Connected To Front House Water And Sewer.
  • 2026
    permit on fileElectrical: New Construction Adu 2 Story With 3 Car Garage, 3 Bedroom And 2 Bathrooms New 2 Gang Meter Main Panel With Sub Panel Inside The House, 2 Gang Meter To Feed Existing House In The Front Underground.
  • 2026
    permit on fileHeating & cooling: Water Heater Upgraded To Tankless Exterior Secured Against Stucco Wall
  • 2026
    permit on file, unconfirmedRoom addition: New Stucco To Match Existing New Adu Construction, Will Tear Old One And Replace With Color Matching Stucco And Remove Old Windows And Install New Windows With The New Stucco, Plywood And Paper Wire Mesh.
  • 2025
    permit on fileElectrical: Temporary Pole 200 Amp Unc-Bldr240702006514
  • 2024
    permit on fileSolar: 1200 Sf 2-Story Accessory Dwelling Unit (Adu) On Proposed 3-Car Garage. Adu To Contain 3 Bedrooms, 2 Bathrooms With Exterior Stairway. Pv Systems Required.

Manage this home to schedule a service or to update the timeline.