LAHomework Sign in
Glendale, CA 91205 · Verd Oaks Dr

1520 Verd Oaks Dr

Built 1950 · 2,175 sq ft
LOT 19,452 SQ FT · 2 STRUCTURES · APN 5683-006-015Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1950
Living area
2,175 sqft
Lot size
19,452 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5683-006-015

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2004
Expected 2024 to 2034From the 2004 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2019
Expected 2029 to 2034From the 2019 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 12 homes on Verd Oaks Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: 225/200A Panel Upgrade W. 200A Main Breaker
  • 2025
    permit on fileElectrical: 225/175A Subpanel
  • 2025
    permit on fileSolar: Installation Of An Ess System 38.4Kwh Or Less And/Or Flush Roof Mounted Photovoltaic System On A Residential Single-Family Dwelling, Including Adus, 38Kw Or Less. This Installation Shall Comply With The Electrical, Fire And Building Provisions Of The Most Recent Applicable Code Cycle.
  • 2024
    permit on fileElectrical: 200 Amp Electrical Panel Upgrade
  • 2021
    permit on filePool: New Pool And Spa With Automatic Pool Cover 15Ft X 30Ft, 15320 Gallons, Gas Pool Heater, Cartridge Filter, No Backwash
  • 2020
    permit on fileSolar: Solar Install 11.97 Kw Photovoltaic System 38 Panels/38 Microinvertors
  • 2020
    permit on fileElectrical: Two Branch Circuits For The Main Breaker Derate Replace Existing 200 Amp Main Brear W/New 175 Amp
  • 2019
    permit on fileWater heater: 1 Water Heater
  • 2019
    permit on fileBathrooms: Converting Existing Office Into A Bathroom (E) 3-Bedroom 2-Bath, New 3-Bedroom And 3-Bath
  • 2018
    permit on fileElectrical: 200 Amp Service
  • 2004
    permit on fileRoof: Material:Class A - No. Of Squares:5Sqs - Tear Off Existing (Y/N):Y - Existing No. Of Layers:2 - New Sheathing (Y/N):N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. - Garage On

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2024 to 2034
  • 2029
    Water heater replacementExpected 2029 to 2034