LAHomework Sign in
Los Angeles, CA 90063 · Kurtz Ave

1513 Kurtz Ave

Built 1909 · 1,767 sq ft
LOT 4,695 SQ FT · 1 STRUCTURE · APN 5224-019-022Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1909
Living area
1,767 sqft
Lot size
4,695 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5224-019-022

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 22 homes on Kurtz Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedHeating & cooling: Mechanical For 1St Floor Bathroom Remodel With No Structural Changes Only.
  • 2026
    permit on file, unconfirmedBathrooms: 1St Floor Bathroom Remodel With No Structural Changes Only.
  • 2025
    permit on file, unconfirmedElectrical: ** No Structural Work Being Done** Electrical For Scope Of Work: Tub To Shower Bathroom Remodel, Convert Drain From 1.5' To 2'. Remove And Replace Valve, Install New Waterproof Shower Pan And Waterproof Solid Surface Walls. Drywall Replace, And Outlet Replace.
  • 2025
    permit on file, unconfirmedBathrooms: ** No Structural Work Being Done** Tub To Shower Bathroom Remodel, Convert Drain From 1.5' To 2'. Remove And Replace Valve, Install New Waterproof Shower Pan And Waterproof Solid Surface Walls. Drywall Replace, And Outlet Replace.
  • 2025
    permit on file, unconfirmedPlumbing: ** No Structural Work Being Done** Plumbing For Scope Of Work: Tub To Shower Bathroom Remodel, Convert Drain From 1.5' To 2'. Remove And Replace Valve, Install New Waterproof Shower Pan And Waterproof Solid Surface Walls. Drywall Replace, And Outlet Replace.
  • 2025
    permit on file, unconfirmedPlumbing: Installation Of A Water Filtration System.

Manage this home to schedule a service or to update the timeline.