LAHomework Sign in
Altadena, CA 91001 · Crest Dr

1487 Crest Dr

Built 1934 · 4,542 sq ft
LOT 21,205 SQ FT · 1 STRUCTURE · APN 5844-026-021Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1934
Living area
4,542 sqft
Lot size
21,205 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
4
Home type
Single-family
Parcel (APN)
5844-026-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 22 homes on Crest Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2020
    permit on file, unconfirmedSolar: Rooftop Solar 12.92 Kw System - 34 Panels
  • 2020
    permit on fileElectrical: Electrical Panel Upgrade To 225 Amps
  • 2019
    permit on fileElectrical: Electrical Panel Upgrade To 200 Amps
  • 2018
    permit on filePlumbing: Re-Pipe 4 Bathrooms, Kitchen, And Laundry - Water & Drain Piping. Relocate Gas Line
  • 2018
    permit on fileBathrooms: Interior Remodel, Convert Walkway To Closet 2Nd Floor, Remodel 2 Bathrooms, Remove Unpermitted Powder Room 1St Floor, Convert Closet To Powder Room And New Drywall 2000 S.F. 1St And 2Nd Floor.
  • 2018
    permit on file, unconfirmedElectrical: House Rewiring

Manage this home to schedule a service or to update the timeline.