LAHomework Sign in
Los Angeles, CA 90247 · S Orchard Ave

14618 S Orchard Ave

Built 1948 · 822 sq ft
LOT 5,375 SQ FT · 1 STRUCTURE · APN 6119-022-046Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1948
Living area
822 sqft
Lot size
5,375 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6119-022-046

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2024
Expected 2044 to 2054From the 2024 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 166 homes on S Orchard Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileRoom addition: Proposed To Add 540 Sq.Ft. Consisting In Two Bedrooms, One 3/4 Bath, New Water Heater, New Wall Furnace, New Laundry Room,Relocate (E) Kitchen, Convert (E) Kitchen Into Dining Area. Extend (E) Porch 32 Sq.Ft.
  • 2024
    permit on fileRoof: Re-Roof With Class A Or B Material Weighing Less Than 6 Pounds Per Sq. Ft. Over New Solid Sheathing 20 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Product Labeled And Ce
  • 2021
    permit on filePlumbing: Sewer Spot Repair Located In Front Yard Will Be Digging Approximately 3 Feet Down And Replace A Section Of Pipe Using 4" Abs

Manage this home to schedule a service or to update the timeline.