LAHomework Sign in
Glendale, CA 91202 · Norton Ave

1429 Norton Ave

Built 1924 · 1,490 sq ft
LOT 12,208 SQ FT · 3 STRUCTURES · APN 5628-002-009Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1924
Living area
1,490 sqft
Lot size
12,208 sqft
Structures on lot
3 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
5628-002-009

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2014
Expected 2034 to 2044From the 2014 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2024
Expected 2034 to 2039From the 2024 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 130 homes on Norton Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileWater heater: Water Heater Change Out/New
  • 2014
    permit on fileRoof: Reroof As Follows: Sfd Cool Roof Coating On Flat Poriton Of Roof 4 Squares This Is A Change Of Roofing Material (Y/N): No Proposed Roofing Material: Comp Shingle Class A Squares (100 Sf) Being Installed: 10 Sq Tear Off Existing (Y/N): Yes Existing Layers Of Roofing: New Sheathing Being Installed (Y/
  • 2003
    permit on fileRoof: Material:Class A - No. Of Squares:6 - Tear Of Existing (Y/N):Y - Existing No. Of Layers:3 - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.