LAHomework Sign in
Los Angeles, CA 90062 · W 51st St

1426 W 51st St

Built 1915 · 1,754 sq ft
LOT 6,466 SQ FT · 2 STRUCTURES · APN 5003-001-010Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1915
Living area
1,754 sqft
Lot size
6,466 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5003-001-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACOn record 2013
Expected 2028 to 2033From the 2013 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 110 homes on W 51st St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on file, unconfirmedSolar: (Eplan) Pv1 For Installation Of Roof Mounted Solar Panels. Pv System Includes 6 Modules With 3 Microinverters Connected To Existing Main Service Panel. System Size Is 2.19Kw Dc/2.30Kw Ac.
  • 2026
    permit on file, unconfirmedSolar: (Eplan) Changes To An Approved Set, Scope Of Work Includes Relocating Equipment Location And Adding A New Load Center.Atten: Matthew Serna A. The Subpanel Location Has Been Changed (Pages 1-Page 2, Page 4)B. The Pv Load Center Has Been Added (Pages 1-Page 2, Page 4)
  • 2018
    permit on file, unconfirmedRoof: Reroof With 25 Sqrs Comp Shingle Roofing. Existing Solid Sheathing. Re · SHARP REMODELING INC
  • 2018
    permit on file, unconfirmedKitchen: Kitchen And Bathroom (2) Remodel For Residential Buildings (No Structu · CALIFORNIA SKYLINE REMODELING INC
  • 2013
    permit on fileHeating & cooling: Hvac Permit · PUENTE CONSTRUCTION
  • 2013
    permit on file, unconfirmedElectrical: Electrical Permit · PUENTE CONSTRUCTION

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2028
    HVAC replacementExpected 2028 to 2033