LAHomework Sign in
Glendale, CA 91205 · Stanford Dr

1419 Stanford Dr

Built 1926 · 1,622 sq ft
LOT 6,478 SQ FT · 2 STRUCTURES · APN 5678-009-022Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1926
Living area
1,622 sqft
Lot size
6,478 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Duplex (2 units)
Parcel (APN)
5678-009-022

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2018
Expected 2038 to 2048From the 2018 permit
HVACOn record 2018
Expected 2033 to 2038From the 2018 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 29 homes on Stanford Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2018
    permit on fileHeating & cooling: Electrical A/C & Compressor Added, Enter Quantity To Apply With Compressors And Condensers : 1
  • 2018
    permit on fileRoof: Roof Torch Down
  • 2018
    permit on fileRoof: Roof Torch Down
  • 2011
    permit on fileRoof: Residential Reroof As Follows:Duplex This Is A Change Of Roofing Material (Y/N): Proposed Roofing Material: Squares (100 Sf) Being Installed: Tear Off Existing (Y/N): Existing Layers Of Roofing: New Sheathing Being Installed (Y/N): High Fire Hazard Zone (Y/N): All Tear-Offs Require Solid Sheathing.
  • 2010
    permit on fileGeneral remodel: Voluntary Remedial Partial Foundation. Replace (E) Cripple Wall With (N) Stem Wall At Planter Area Only. No Exterior Changes To (E) House
  • 2010
    permit on fileHeating & cooling: Replace 1 Furnace Up To 100,000 Btu.

Manage this home to schedule a service or to update the timeline.