LAHomework Sign in
Glendale, CA 91207 · Ethel St

1416 Ethel St

Built 1927 · 3,937 sq ft
LOT 7,614 SQ FT · 2 STRUCTURES · APN 5650-035-007Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1927
Living area
3,937 sqft
Lot size
7,614 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
5650-035-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2026
Expected 2046 to 2056From the 2026 permit
HVACOn record 2014
Expected 2029 to 2034From the 2014 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 92 homes on Ethel St →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileRoof: Re-Roof: Lift And Reinstall Existing Tiles. Install Titanium Psu-30 Underlayment And Ice/Water Shield. Flat Roof (12 Sq): Tear Off And Re-Roof With 2-Ply App Modified Torch Down. In Case Of Tile Damage, Any Replacement Tiles Will Match The Existing Ones In Shape, Profile, Color, Texture, And Size
  • 2026
    permit on fileRoof: Tile Relay (29Sq) Lift And Stack Existing Tiles, Install Titanium Psu-30 Peel-N-Stick Underlayment And Self-Adhered Modified Ice/Water. Then Reinstall The Same Existing Tiles Back On The Roof. Flat Roof (12Sq) Tear Off And Re-Roof With 2 Ply App Mod Torch Garage Is Detached And Included
  • 2014
    permit on fileHeating & cooling: 2 Fau Up To 100000Btu,2 3Hp To 15Hp Motors

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2029
    HVAC replacementExpected 2029 to 2034