LAHomework Sign in
Glendale, CA 91207 · Del Monte Dr

1415 Del Monte Dr

Built 1935 · 2,164 sq ft
LOT 13,485 SQ FT · 2 STRUCTURES · APN 5650-005-018Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1935
Living area
2,164 sqft
Lot size
13,485 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
5650-005-018

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2011
Expected 2031 to 2041From the 2011 permit
20262035
HVACOn record 2013
Expected 2028 to 2033From the 2013 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 9 homes on Del Monte Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2013
    permit on fileHeating & cooling: 1 Heating Appliance, 1 A/C Side Yard, 1 Connection Gas System.
  • 2013
    permit on fileElectrical: 1-200 Amp Service, 1-Motor.
  • 2011
    permit on fileRoof: Reroof As Follows: This Is A Change Of Roofing Material (Y/N): N Proposed Roofing Material: Class A Squares (100 Sf) Being Installed: 8 Tear Off Existing (Y/N): Y Existing Layers Of Roofing: New Sheathing Being Installed (Y/N): N High Fire Hazard Zone (Y/N): Y All Tear-Offs Require Solid Sheathing.
  • 2011
    permit on fileRoof: Reroof As Follows: This Is A Change Of Roofing Material (Y/N): N Proposed Roofing Material: Class A Squares (100 Sf) Being Installed: 16 Tear Off Existing (Y/N): Y Existing Layers Of Roofing: New Sheathing Being Installed (Y/N): N High Fire Hazard Zone (Y/N): Y All Tear-Offs Require Solid Sheathing.

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2028
    HVAC replacementExpected 2028 to 2033
  • 2031
    Roof replacementExpected 2031 to 2041